Notice to Bidders - The University of Memphis is seeking to build a detention pond near the Engineering buildings in the summer of 2025 and would like to invite initial bid proposals for design and construction. Three available sites on the university property are appropriate for the project. The bid/proposal must include an analysis of each assigned site with several alternative designs for the detention pond. Based on this analysis, one detention pond design for construction is recommended. All construction must be completed before August 1, 2025.
 
  • The final packet submitted for bid/proposal is due no later than April 29, 2025 and must include the following:

    • Title Page - Follow the Report Guidelines (1 page)
    • Table of Contents/List of Figures - Follow the Report Guidelines (1 page)
    • Introduction - Background, objective, and tasks (limited to 2 pages)
    • Methodology - - Discuss developing a detention pond to meet the design criteria. This section should discuss the following components: original topographic data (including a north arrow and street marking on the map); approximating cut-and-fill volume; approximating the pond volume; and estimating total project cost (limited to 4 pages).
    • Detention Pond Design - This section should have the following components: a discussion of the proposed detention pond design and a topographic presentation of the pond design (including a north arrow and street marking on the map) - (limited to 2 pages).
    • Strengths/Weaknesses of Design - (limited to 1 page).
    • A copy of your design must be submitted to Dr. Charles Camp

  • A mandatory poster presentation to The University of Memphis' College of Engineering's Board of Directors will occur on April 29, 2025, at 1:00 p.m.

Project Specifications: Click here for detailed specifications

Project Deadlines: Final packets and Presentations are due Tuesday, April 29, 2025  -- 1:00 p.m. Engineering Auditorium

Date Activity
April 15-17, 2025   Traverse and topographic survey
April 22-24, 2025   Cut-and-fill calculations; open lab
April 29, 2025 - 1:00 p.m.   Detention pond design bid package 
  Poster presentation

Please address all questions, comments, and correspondence to:

Dr. Claudio Meier, Project Director
Department of Civil Engineering
The University of Memphis
Memphis, TN 38152

Evaluation Criteria: The reinforced concrete beam project will be evaluated as follows:

  • Project Report
    • Format and Readability (25 points) - Technical writing combines format, content, and document design.
       
    • Technical Content (65 points) - Use of engineering design concepts, completeness of ideas, support of decisions presented, comprehensiveness of observations and conclusions.
       
    • Report Guidelines

  • Poster Presentation (10 points) - Based on peer reviews of the presentation

 


This website was originally developed by Charles Camp for CIVL 1112.
This site is maintained by the Department of Civil Engineering at the University of Memphis.
Your comments and questions are welcomed.

striped line
Department of Civil Engineering | 104 Engineering Science Bldg |Memphis, TN 38152 | Phone: 901/678-2746 | Fax: 901/678-3026 | Last updated: 04/11/2025