striped line
Department of Civil Engineering
CIVL 1112 - Detention Pond Project Evaluation Criteria
set cell vertical height

 

Format and Readability Evaluation Criteria

Section

Criteria Descriptions

Points

Score

Format
(20 points)
Title page is formatted correctly
(group name is provided, all individual members are listed)

2

 
Table of Contents formatted appropriately 2  
List of Tables and List of Figures formatted appropriately 2  
Consistency of headings and sub-headings 2  
Pagination: Proper numbering of all pages include front matter 2  
Consistent font style and size 2  
Correct format for figures and tables 2  
Correct references for figures and tables 2  
Correct format and references for equations 2  
Consistent spacing between sections of the report 2  
Readability
(5 points)
Paragraph and sentence structure; text flow; organization of ideas; correct use of language; use of figures and tables for illustration of ideas; etc.

5

 

 Score

 Total Points

25

 

 

 

 


This website was originally developed by Charles Camp for CIVL 1112.
This site is maintained by the Department of Civil Engineering at the University of Memphis.
Your comments and questions are welcomed.

striped line
Department of Civil Engineering | 104 Engineering Science Bldg |Memphis, TN 38152 | Phone: 901/678-2746 | Fax: 901/678-3026 | Last updated: 04/09/2025