Introduction
|
Background:
Identify the competition
organizer and the competition rules
|
2 |
|
|
Objectives:
State your groups
primary and secondary objective(s)
|
2 |
|
|
Tasks:
Identify at least three specific
tasks required to meet your objective(s)
|
3 |
|
|
Methods/Procedures
|
Proportioning a Concrete Mix:
Detail the procedure for estimating the volume of concrete and the
weight of each component required for a given mix, and justify any
assumptions
|
6 |
|
Mixing Concrete:
Give a step and step procedure for mixing concrete |
5 |
|
Mix 1:
Concrete mix, graph of Mix 1 data, and strengths/weaknesses of the design |
8 |
|
Mix 2:
Selection of concrete mix, admixtures, curing, average compressive stress
from testing, and strengths/weaknesses |
8 |
|
Mix
3:
Selection of concrete mix, admixtures, curing, average compressive stress
from testing, and strengths/weaknesses |
8 |
|
Final Mix Design:
Selection of
concrete mix, admixtures, curing, average compressive stress from testing, and strengths/weaknesses;
graph change in weekly compressive stresses |
8 |
|