CIVL 1101 - Project #2 Technical Content
set cell vertical height
 

Technical Content Evaluation Criteria

Section

Topic

Points

Score

Introduction

Background:
Identify the competition organizer and the competition rules

2  

Objectives:
State your groups primary and secondary objective(s)

2  

Tasks:
Identify at least three specific tasks required to meet your objective(s)

3  

Methods/Procedures

Proportioning a Concrete Mix:
Detail the procedure for estimating the volume of concrete and the weight of each component required for a given mix, and justify any assumptions

6  
Mixing Concrete:
Give a step and step procedure for mixing concrete
5  
Mix 1:
Concrete mix, graph of Mix 1 data, and strengths/weaknesses of the design
8  
Mix 2:
Analysis of Mix 1 data, selection of concrete mix, admixtures, curing, and strengths/weaknesses of the design
8  
Mix 3:
Analysis of Mix 2 data, selection of concrete mix, admixtures, curing, and strengths/weaknesses of the design
8  
Final Mix Design:
Analysis of Mix 3 data, selection of concrete mix, admixtures, curing, and strengths/weaknesses of the design
8  

 

 


This website was originally developed by Charles Camp for CIVL 1101.
This site is Maintained by the Department of Civil Engineering at the University of Memphis.
Your comments and questions are welcomed.

striped line
Department of Civil Engineering| 104 Engineering Science Bldg. |Memphis, TN 38152 | Phone: 901/678-2746 | Last updated: 09/27/2024