striped line
Department of Civil Engineering
CIVL 3121 - Homework Assignments
set cell vertical height
 

Assignment #

   Problems

   Due

0

Introductory Quiz - Solution

September 1

1

2-19, 2-21, and 2-23

September 3

2

2-24, 2-26, and 2-27

September 8

3

2-11, 3-3, and 3-5

September 10

4

3-8, 3-39, and 3-41

September 15

5

3-13, 3-14, and 3-42 Using SAP2000

September 17

6

Predict SWR for K'NEX Truss and Initial Design

September 22

7

4-1, 4-3, and 4-5

September 24

8

4-10, 4-20, and 4-30

September 29

9

Initial K'NEX Design Report

October 1

10

4-2, 4-21, and 4-29

October 6

11

4-49, 4-58, and 4-63

October 8

12

4-50, 4-52, and 4-62

October 13

13

8-5, 8-8, and 8-10 (use direct integration)
Project 1 Survey

October 22

14

8-1 [assume Θ(x=L/2)=0], 8-3, and 8-7

October 27

15

8-26, 8-27, and 8-28 (use conjugate beam method)

October 29

16

8-33, 9-1, and 9-11 (may use SAP2000)

November 3

17

9-18 and 9-30 (may use SAP2000) and 9-51

November 5

18

9-53, 9-56, and 9-64

November 10

19

9-58 and Wood Beam 1

November 12

20

6-1, 6-5, and Wood Beam 2

November 17

21

6-10, 6-16, and 6-18

November 19

22

6-25, 6-30, and 6-59

November 24

 

 

 

 

 

 


This web site was originally developed by Charles Camp for CIVL 3121.
This site is maintained by the Department of Civil Engineering at the University of Memphis.
Your comments and questions are welcomed.

striped line
Contact Department Civil Engineering | 104 Engineering Science Bldg |Memphis, TN 38152 | Phone: 901/678-2746 | Fax: 901/678-3026 | Last updated: 11/19/2009
Text Only | Print | Contact UM | Memphis, TN 38152 | 901/678-2000 | Copyright 2009 University of Memphis | Important Notice