striped line
Department of Civil Engineering
CIVL 1112 - Reinforced Concrete Beam Project Schedule
set cell vertical height

 

Date Activity
February 25-27 Project Introduction; concrete mix #1; concrete beam #1
March 4-6 Break beam #1; develop concrete beam #2
March 11-13 Spring Break
March 18-20 Break beam #2; develop concrete beam #3
March 25-27 Break beam #3; develop concrete beam #4
April 1-3 Break beam #4; develop final concrete beam
April 8-10 Break final concrete beam
 April 13 Reinforced concrete beam presentations - 6:00 p.m.

 

  • Concrete Mix - (ACI method for concrete mix design) - Design a mix using the information given in Assignment #5 and Assignment #6, for a 28-day compressive strength assigned in lab.
     

  • Concrete Beam #1 - Each group will construct a rectangular reinforced concrete beam with #3 rebars positioned at a specified depth.
     

  • Concrete Beams #2 - #4 and Final Project Beams - Each group will develop their own strategy towards achieving a concrete mix design and a reinforced concrete beam design that will have the highest SWR in the class.

 

 

 


This website was originally developed by Charles Camp for CIVL 1112.
This site is maintained by the Department of Civil Engineering at the University of Memphis.
Your comments and questions are welcomed.

striped line
Department of Civil Engineering | 104 Engineering Science Bldg |Memphis, TN 38152 | Phone: 901/678-2746 | Fax: 901/678-3026 | Last updated: 02/21/2025