Date Activity
February 21-23 Project Introduction; concrete mix #1; concrete beam #1
February 28 - March 2 Break beam #1; develop concrete beam #2
March 7-9 Spring break
March 14-16 Break beam #2; develop concrete beam #3
March 21-23 Break beam #3; develop concrete beam #4
March 28-30 Break beam #4; develop final concrete beam
April 4-6 Break final concrete beam
 April 16 Reinforced concrete beam presentations - 6:00 p.m.

 

  • Concrete Mix - (ACI method for concrete mix design) - Design a mix using the information given in Assignment #5 and Assignment #6, for a 28-day compressive strength assigned in lab.
     

  • Concrete Beam #1 - Each group will construct a rectangular reinforced concrete beam with #3 rebars positioned at a specified depth.
     

  • Concrete Beams #2 - #4 and Final Project Beams - Each group will develop their own strategy towards achieving a concrete mix design and a reinforced concrete beam design that will have the highest SWR in the class.

 

 

 


This website was originally developed by Charles Camp for CIVL 1112.
This site is maintained by the Department of Civil Engineering at the University of Memphis.
Your comments and questions are welcomed.

striped line
Department of Civil Engineering | 104 Engineering Science Bldg |Memphis, TN 38152 | Phone: 901/678-2746 | Fax: 901/678-3026 | Last updated: 02/15/2024