striped line
Department of Civil Engineering
Computational Assignment #12
set cell vertical height

 

"Sometimes the questions are complicated and the answers are simple."  -  Dr. Suess

Objective

The purpose of this assignment is twofold: (1) review computing the bearings of a traverse based on survey data and a reference bearing, and (2) use your spreadsheet to compute the area of the traverse and the x and y coordinates of the points of your Project #3 site.

You must submit the cover sheet for the assignment, your calculation on engineering paper for Part 1 and printouts of your spreadsheet for Part 2. Also, submit your spreadsheets for Part 2 to Canvas. You must follow the Excel format.

Part 1: Using the traverse data collected in the lab, determine the bearings of each side and then use your traverse spreadsheet to compute the corrected and balanced latitudes and departures for the traverse. Show all work for determining the bearing of each side (follow the homework format)

Part 2: Use your traverse spreadsheet to compute the latitudes and departures, balance the latitudes and departures with the compass rule, area using DMD, the x- and y-coordinates, assuming point A is (200, 200), and plot the traverse area.

 

 

 

 

 

 

 

 

 

Cover sheet for homework


This website was originally developed by Charles Camp for CIVL 1112.
This site is maintained by the Department of Civil Engineering at the University of Memphis.
Your comments and questions are welcomed.

striped line
Department of Civil Engineering | 104 Engineering Science Bldg |Memphis, TN 38152 | Phone: 901/678-2746 | Fax: 901/678-3026 | Last updated: 04/11/2025