



|
|
The class schedule is somewhat a work in progress.
I may update it periodically during the semester.
The schedule below was last updated on
04/15/2015.
Week |
Date |
Topic |
Reading |
1 |
Jan 20 |
Course Information, Introduction to Geotechnical Engineering |
Petroski Article |
|
Jan 20,22 |
Lab: Introduction, Report Preparation, Determination of Water
Content |
L1, L2 |
|
Jan 22 |
Rock Cycle, Origin of Soil, Soil Deposit Types |
2.1-2.10 |
2 |
Jan 27 |
Soil-Particle Size, Clay Minerals |
2.11-2.12 |
|
Jan 27,29 |
Lab: Hydrometer Analysis |
L5 |
|
Jan 29 |
Specific Gravity, Gradation Analysis, Particle Shape |
2.13-2.17 |
3 |
Feb 3 |
Weight-Volume Relationships |
3.1-3.4 |
|
Feb 3,5 |
Lab: Measurement of Liquid Limit and Plastic Limit |
L6,L7 |
|
Feb 5 |
Weight-Volume Relationships (cont), Relative Density, Consistency of
Soil |
3.1-3.10 |
4 |
Feb 10 |
Soil Classification |
4 |
|
Feb 10,12 |
Lab: Visual-Manual Classification of Soil |
L9 |
|
Feb 12 |
Soil Classification |
4 |
5 |
Feb 17 |
Class Cancelled Due to Inclement Weather |
|
|
Feb 17,19 |
Lab: Laboratory Soil Compaction |
L12, L13 |
|
Feb 19 |
Soil Compaction |
5.1-5.5 |
6 |
Feb 24 |
Soil Compaction |
5.7-5.10 |
|
Feb 24,26 |
Lab: Determination of Field Unit Weight |
L14 |
|
Feb 26 |
Hydraulic Conductivity |
6.1-6.5, 6.8 |
7 |
Mar 3 |
Hydraulic Conductivity |
6.1-6.5, 6.8 |
|
Mar 3,5 |
Lab: Measurement of Hydraulic Conductivity |
L10, L11 |
|
Mar 5 |
Examination No. 1 (Chapters 2, 3, 4, and 5) |
|
8 |
Mar 10 |
Spring Break - No Class |
|
|
Mar 10,12 |
Spring Break - No Labs |
|
|
Mar 12 |
Spring Break - No Class |
|
9 |
Mar 17 |
Seepage |
7.1-7.4 |
|
Mar 17,19 |
Lab: Subsurface Exploration |
12 |
|
Mar 19 |
Seepage |
7.1-7.4 |
10 |
Mar 24 |
Stresses in a Soil Mass: Effective Stress Concept |
8.1-8.2 |
|
Mar 24,26 |
Lab: Subsurface Exploration |
12 |
|
Mar 26 |
Vertical Stress Increase Due to Various Types of Loading |
8.6-8.10 |
11 |
Mar 31 |
Consolidation Theory |
9.1-9.6 |
|
Mar 31, Apr 2 |
Lab: One-Dimensional Consolidation Test of Cohesive Soil |
|
|
Apr 2 |
Consolidation Settlement |
9.7-9.8 |
12 |
Apr 7 |
Consolidation Rate |
9.10-9.11 |
|
Apr 7,9 |
Lab: Unconfined Compressive Strength & Pocket Penetrometer |
L15 |
|
Apr 9 |
Consolidation Settlement under a
Foundation |
9.12 |
13 |
Apr 14 |
Shear Strength of Soil |
10 |
|
Apr 14,16 |
Lab: Direct Shear Strength |
L18 |
|
Apr 16 |
Shear Strength of Soil |
10 |
14 |
Apr 21 |
Examination No. 2 (Chapters 6, 7, 8, and 9) |
|
|
Apr 21,23 |
Lab: Triaxial Shear Strength |
L16 |
|
Apr 23 |
Shear Strength of Soil |
10 |
15 |
Apr 28 |
Shear Strength of Soil |
10 |
|
Apr 28, 30 |
No labs |
|
|
Apr 30 |
Study Day – No Class |
|
16 |
May 7 |
Final Exam (8:00 a.m.-10:00 a.m.) |
|
|